UNDO plans four phases over 90 days, from the site and simulation to a capped mainnet, open arbitration and a second audit.

Four phases over 90 days

The plan covers 90 days and four phases. Each phase has a short list of deliverables.

PhaseFocusMain deliverables
1Explain and simulateSite, docs, simulation
2Build and testTestnet contracts, x402 receipt middleware, first audit
3Launch smallCapped mainnet, Agent lane first
4Open upOpen arbitration, appeal, second audit, legal review of the Guarantee Pool

Phase 1: site, docs and simulation

The current phase.

  • This site and these docs.
  • The simulator, which shows capacity, instant payout, escrow fallback and disputes with sample numbers.

The simulation moves no real funds. It never sends a transaction and never asks for a signature or an approval.

Phase 2: testnet

  • The six contracts on testnet: UndoPay, BondVault, Disputes, Receipts, SellerRegistry and StakeModule.
  • An x402 receipt middleware, so that a seller's API can sign and attach receipts without custom code.
  • The first audit.

Interfaces such as the receipt struct on the Agent lane page are drafts until this phase. Expect them to change.

Phase 3: capped mainnet, Agent lane first

  • Mainnet deployment with caps, including the 2,500 USDC per-payment cap.
  • The Agent lane opens first.

The Agent lane goes first for a reason. Amounts are small, sessions last from 10 minutes to 24 hours, and most refunds are decided by a signature check: a missing or late signed receipt means an automatic refund. That lets the core contracts run with real funds before the protocol depends on human arbitration.

Phase 4: open arbitration and review

  • Open arbitration: 3 arbitrators drawn at random among $UNDO stakers, commit-reveal vote within 72h.
  • Appeal to 7 arbitrators with a doubled deposit.
  • The second audit.
  • Legal review of the Guarantee Pool.

The Guarantee Pool itself is not a deliverable of these 90 days. It belongs to the second stage of the protocol, called phase 2 elsewhere in these docs, and only if the legal review allows it. See Guarantee Pool.

What is not on this roadmap

  • A token date. $UNDO is not launched and has no contract address. The launch will be announced only on X at x.com/UndoOnArc. See $UNDO token.
  • Calendar dates. We would sooner be late than ship unaudited code that holds bonds.
  • Named partners. UNDO is an independent project built on Arc. There are no partnerships to announce.